CS605 Quiz 2 Fall 2020

CS605 Quiz 2 Fall 2020

Quiz File 1

 

Question No 1

Change Control process addresses the important question of:

who has the responsibility for approving and ranking changes (Page 121)

Question No 2

_________ are mechanisms that lead to prevention of potential quality problem before it occurs or its rapid detection if  introduced.

Mistake-Proofing  (Page 117)

Question No 3

___________ is an analysis technique which can be used to predict the chain of events that can cause hazards.

Fault Tree Analysis (Page 117)

Question No 4

The goal of __________ is to manage and control change.

Software Configuration Management (Page 119)

Question No 5

The reliability of a software can be determined by “MTBF” which stands for _________ .

Mean Time Between Failure (Page 116)

Question No 6

Legacy system migration however is a _________ task and there are a number of risks involved that need to be mitigated.

Easy (Page 134)

Question No 7

_____ errors are most costly to fix.

Requirement (Page 127)

 

 

Question No 8

_________ is a quality assurance process used to reduce defects by avoiding or correcting mistakes in early design and development phases.

Defect Removal (Page 69)

Question No 9

Poka Yoke is a Japanese term and it means:

Mistake Proofing (Page 118)

Question No 10

A/An __________ is used to fine tune the product by fixing minor product defects.

Enhancement

Quiz File 2

Question No 1

_________ is a quality assurance process used to reduce defects by avoiding or correcting mistakes in early design and development phases.

Defect Removal

Question No 2

_________ are mechanisms that lead to prevention of potential quality problem before it occurs or its rapid detection if  introduced.

Mistake-Proofing (Page 117)

Question No 3

Which of the following is NOT one of the tasks included in Software Configuration Management:

Test Case development  ……..Page 121

Question No 4

‘CCB’ decides whether to allow or deny a change request, it stands for ________.

Change Control Board     …….Page 124

Question No 5

Mean Time Between Failure (MTBF) can be calulated by _______.

MTBF=MTTF+MTTR ……… page 116

 

Question No 6

The goal of __________ is to manage and control change.

Software Configuration Management   ………Page 119

Question No 7

Software configuration management tasks include Identification, Version Control, Change Control, Configuration Auditing and ___________ .

Reporting  …….. 121

Question No 8

Poka Yoke is the name of a ________.

Quality Assurance(QA) technique ………. Page 118

Question No 9

Normally the compound number, used for release version numbering, is of the format:

X.Y.Z

Question No 10

The goal of software development is to develop _____ software on time and on budget, that meets customers’ real needs.

Quality ……… Page 127

Click Below Link To Download Quiz in PDF Format

Related Articles

Responses

Your email address will not be published. Required fields are marked *